Exclusive Data Center Opportunity

CARBON-
NEGATIVE
DATA CENTER

Immediate and phased power delivery in a supply-constrained market where utility timelines can exceed multiple years.

1970 Stoneman Circle
Lakewood (Busti), NY
Chautauqua County
716.222.2188
60 MW
Total campus capacity
750 W/SF
AI-ready density
250 KW
Per rack capability
400 Gbps
Per metro corridor
Power Platform

BUILT FOR
SPEED TO POWER.

CNDC delivers immediate and phased capacity through a behind-the-meter microgrid — bypassing the utility queue entirely in a supply-constrained market.

Power Platform
Initial blocks1–10 MW
Total campusUp to 60 MW
ArchitectureBehind-the-meter
StorageBESS integration
Distribution13.8 kV
Onsite generationUp to 60 MW
Designed for AI
DensityUp to 750 W/SF
Per rackUp to 250 KW
CoolingLiquid cooling ready
DeploymentModular pod
Use casesAI / HPC / Enterprise
DeliveryPowered shell / BTS
Carbon Negative
GenerationOnsite renewable
Grid capabilityMicrogrid capable
StorageBattery integrated
LocationWestern NY (CHA Co.)
Metro access2–3 hrs to majors
MarketEmerging frontier
SPEED TO POWER IN A CONSTRAINED MARKET.

In markets where traditional utility interconnection timelines stretch beyond two years, CNDC's behind-the-meter microgrid delivers immediate and phased power blocks starting at 1–10 MW — without waiting in the utility queue.

Located in Western New York's Chautauqua County industrial zone, CNDC is positioned in an emerging frontier data center market with direct access to Buffalo, Cleveland, and Pittsburgh fiber corridors at 400 Gbps each.

Phase 1 is structured as a powered shell and build-to-suit path with 2–3% annual escalation. Pricing is available upon request for qualified parties.

Connectivity

THREE METROS.
400 GBPS EACH.

Low-latency, redundant transport connecting CNDC to the Northeast and Midwest's key carrier and cloud access points.

Buffalo
400 Gbps
Low latency access
Redundant routes
Carrier + cloud access
Cleveland
400 Gbps
Low latency access
Redundant routes
Carrier + cloud access
Pittsburgh
400 Gbps
Low latency access
Redundant routes
Carrier + cloud access
Availability & Phasing

PHASE 1
NOW AVAILABLE.

Structured for practical deployment with flexible block sizing, build-to-suit options, and predictable escalation terms.

Delivery model
Powered Shell
Build-to-suit path available for qualified tenants with specific infrastructure requirements.
Initial block size
1–10 MW
Phased increments up to 60 MW total campus capacity as deployment matures.
Pricing
On Request
Available following a brief qualification conversation. No published rack rates.
Escalation
2–3% / yr
Predictable annual escalation baked in for long-term planning certainty.
How it works

FOUR STEPS TO
DEPLOYMENT.

01

Inquiry and requirements review

Share your power needs, deployment type, timeline, and use case with our AI agent. Qualifying takes minutes.

02

Power block and deployment fit

We map your MW requirements to available capacity blocks and appropriate delivery phases.

03

Commercial and technical diligence

Qualified parties receive full specs, site plans, pricing, and 2–3% escalation terms for review.

04

Phased delivery planning

Finalize your deployment schedule, execute the lease, and begin the structured buildout process.

Project Details

DOCUMENTS FOR
APPROVED PARTIES.

Technical specifications, financial structure, site plans, and partnership terms unlock automatically after a brief qualification conversation below.

ACCESS REQUIRES QUALIFICATION

Talk to our AI leasing agent below. Once you've shared your capacity needs and timeline, project documents will unlock here automatically.

Technical

Site & power specifications

Full infrastructure, density, microgrid, and 13.8 kV distribution details

View document →
Leasing

Phased deployment terms

Block sizing, pricing framework, 2–3% escalation schedule, and timeline

View document →
Connectivity

Network & carrier details

Fiber routes, redundancy design, and carrier / cloud access documentation

View document →
Sustainability

Carbon-negative overview

Onsite generation design, BESS integration, and microgrid architecture

View document →
AI Leasing Agent

TALK TO CNDC.

Tell our agent your deployment type, power need, and timeline. Qualified inquiries unlock project documents and connect you with the ESG Energy team.

CNDC Leasing Agent

Powered by ESG Energy · Responds instantly

716.222.2188
Hi — I'm the CNDC leasing agent, representing ESG Energy's Carbon-Negative Data Center Campus in Lakewood, NY.

We offer immediate and phased power delivery starting at 1–10 MW blocks, up to 60 MW campus total, with 750 W/SF AI-ready density and 250 KW per rack. What type of deployment are you evaluating?
Just now